Standards & Specifications

Gray’s technicians perform testing to numerous industry standards every day. The list below reflects the scope of our ISO 17025 accreditation (maintained through the A2LA) but is not an exhaustive list of our capabilities. Contact us with your testing requirements and we can help you meet them!

Dynamics

Vibration
  • MIL-STD-164 A (Method I)
  • MIL-STD-202 E, F, G (Methods 201, 203, 204, 214)
  • MIL-STD-750 C, D, E, F (Method 2046, 2056, 2057)
  • MIL-STD-810 Base A, B, C, D, E, F, G (Methods 514, 519, 526)
  • MIL-STD-1344 A (Through Notice 6) (Method 2005)
  • MIL-STD-1576 Base (Method 3113)
  • MIL-STD-1540 B, C, D
  • RTCA/DO-160 B, C, D, E, F, G (Section 8)
  • SAE/USCAR 24 (Initiator Requirements) June 2004
  • SAE/USCAR 28 (Initiator Requirements) June 2005
  • TSC-3000G
Pyro Shock
  • Mil-STD-810 (All)
  • Mil-STD-1512 (All)
  • MIL-STD-1576 (All)
Drop Shock
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 516)
  • MIL-STD-202 E, F, G (Method 213)
  • MIL-STD-1344 A (through Notice 6) (Method 2004)
  • MIL-STD-1576 Base (Method 3114)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • TSC-3000G
Shaker Shock
  • MIL-STD-202 E, F, G (Method 213)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 516)
  • MIL-STD-1344 A (through Notice 6) (Method 2004)
  • Mil-Std-1576 (All);
  • RTCA/DO-160 B, C, D, E, F, G (Section 7)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • TSC-3000G

Climatics

Temperature Cycling
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 520)
  • MIL-STD-1344 A (through Notice 6) (Method 1003)
  • MIL-STD-1576 (All)
  • RTCA/DO-160 B, C, D, E, F, G (Section 5)
  • TSC-3000G
Temperature Shock
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 503)
  • MIL-STD-202 E, F, G (Method 107)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • TSC-3000G
Temperature/Humidity
  • RTCA/DO-160 B, C, D, E, F, G (Section 6)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 507)
  • MIL-STD-202 E, F, G (Method 103)
  • MIL-STD-1344 A (through Notice 6) (Method 1002)
  • MIL-STD-1576 (All)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • IEC 60601-1-11
  • TSC-3000G
Temperature/Altitude
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 500)
  • MIL-STD-202 E, F, G (Method 105)
  • RTCA/DO-160 B, C, D, E, F, G (Section 4)
  • SAE/USCAR 28 (Initiator Requirements) June 2005
  • ISO 14708-3
  • TSC-3000G
High Temperature
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 501)
  • MIL-STD-202 E, F, G (Method 108)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • IEC 60601-1
  • TSC-3000G
Low Temperature
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 502)
  • MIL-STD-1540 (All);
  • IEC 60601-1-11
  • TSC-3000G
Combined Environments (Vibe/Temp/Humidity)
  • RTCA/DO-160 B, C, D, E, F, G (Section 4)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 520)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • TSC-3000G
Thermal Vacuum
  • MIL-STD-1540
  • MIL-STD-8106
  • MIL-STD-1576

Electrical

Resistance
  • MIL-STD-202 E, F, G (Method 303)
  • MIL-STD-1576 Base (Method 2201)
  • MIL-HDBK-1512 Base (Method 201)
  • MIL-DTL-38999 J, K, L (w/ amendment 1) (Method 4.5.13)
  • SAE/USCAR Initiator Requirements (Para. 4.7.2.1 - 4.7.2.3), June 2005
  • 98560NDS00 [10], (Section 12-3), 10 (4 Dec. 2007)
Current
  • SAE/USCAR Initiator Requirements (Para. 4.7.3.11 & 4.7.3.12), June 2005
  • 98560NDS00 [10], (Section 12-2), 10 (4 Dec. 2007)
  • MIL-STD-1576 (All)
Insulation Resistance
  • MIL-STD-202 E, F, G (Method 302)
  • MIL-STD-1344 A (through Notice 6) (Method 3003)
  • MIL-STD-1576 Base (Method 2117)
  • MIL-DTL-38999 J, K, L (w/ amendment 1) (Method 4.5.9)
  • 98560NDS00 [10], (Section 12-4), 10 (4 Dec. 2007)
Electrostatic Discharge
  • RTCA/DO-160 B, C, D, E, F, G (Section 25)
  • SAE J1113 Base
  • SAE/USCAR Initiator Requirements (Para. 3.2.1.8.1 & 3.2.1.8.2), June 2005
  • 98560NDS00 [10], (Section 12-5), 10 (4 Dec. 2007)
Dielectric Withstand Voltage
  • MIL-STD-202 E, F, G (Method 301)
  • MIL-STD-1344 A (through Notice 6) (Method 3001)
  • MIL-DTL-38999 J, K, L (w/ amendment 1) (Method 4.5.10)
  • MIL-PRF-49142 Base, A, B (w/ amendment 1) (Method 4.6.11)
Magnetic Effects
  • RTCA/DO-160 B, C, D, E, F, G (Section 15)
Electrical Automotive Systems
  • ISO 16750-2
  • ISO 7637-2
  • ISO 7637-3

Other Environments

Salt/SO2 Fog/Spray:
  • MIL-STD-202 E, F, G (Method 101)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 509)
  • MIL-STD-1344 A (through Notice 6) (Method 1001)
  • RTCA/DO-160 B, C, D, E, F, G (Section 14)
  • SAE/USCAR 24 (Inflator Requirements) June 2004
  • SAE/ USCAR 28 (Initiator Requirements) June 2005
  • ASTM B117-73, -94, -97, -02, -02, -07, -09, -11
  • TSC-3000G
Solar Radiation/Sunshine
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 505)
  • TSC-3000G
Explosive Atmosphere
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 511)
  • RTCA/DO-160 B, C, D, E, F, G (Section 9)
  • TSC-3000G
Explosive/Rapid Decompression
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 500)
  • RTCA/DO-160 B, C, D, E, F, G (Section 4)
Rain
  • RTCA/DO-160 B, C, D, E, F, G (Section 10)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 506)
  • TSC-3000G
Freezing Rain
  • RTCA/DO-160 B, C, D, E, F, G (Section 24)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 521)
  • TSC-3000G
Fluid Susceptibility
  • MIL-STD-810 F, G (Method 504)
  • MIL-STD-1344A, Method 1016
  • RTCA/DO-160 B, C, D, E, F, G (Section 11)
  • TSC-3000G
Sand & Dust
  • MIL-STD-202 E, F, G (Method 110)
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 510)
  • RTCA/DO-160 B, C, D, E, F, G (Section 12)
  • SAE J1211 (Section 4.5), Nov. 78 (dust only)
  • SAE J1455 (Section 4.7), Aug. 94 (dust only)
  • TSC-3000G

Mechanical Loading

Tensile/Compression
  • MIL-STD-202 E, F, G (Method 211) (Condition A)
  • UL 514-D Section 5.3.7.1
  • TSC-3000G
Acceleration
  • MIL-STD-810 Base, A, B, C, D, E, F, G (Method 513)
  • MIL-STD-202 E, F, G (Method 212)
  • MIL-STD-1344 A (through Notice 6) (Method 2011)
  • RTCA/DO-160 B, C, D, E, F, G (Section 7)
  • SAE/USCAR 28 (Initiator Requirements) June 2005
Push, Drop, and Impact
  • IEC 60601-1
Random Drop and Tumble
  • MIL-STD-202 (Method 203C)

Positive Pressure (Overpressure)

  • RTCA/DO-160 B, C, D, E, F, G (Section 15)